The needs analysis that determines the entire project

September 18, 2026 by

Some clients come with a ready-made answer. Others don't even know how many employees they should plan for. This is how you handle both.



A client comes to the first meeting with all the answers already in place. Policy documents, a space programme calculated down to the last square metre and an exact number of employees in each department. The next client barely knows whether the new office will need to accommodate twenty or seventy people. Same type of project, same industry, but two completely different starting points. Treat them the same way and the first project becomes overly rigid, while the second risks becoming chaotic.

Nadja Tolstoy and Linus Fridén at Tengbom talk about that very span in their conversation with Pendax CEO Janne Frisell and describe it as one of the most challenging parts of an office project. Harder than the actual design because everything that comes after is based on getting this diagnosis right.

With a client who already has a well-developed basis, the role of the architect is less about coming up with new answers and more about testing the answers that already exist. Does the assumption about hybrid degree still hold? Is the room program designed for today's way of working, or for how it looked when the document was written two years ago? Here, the task is to be a constructive reviewer, not a passive executor.

With a client at the other end of the scale, the process looks very different. It is not enough to simply ask what the client wants, because they do not know themselves. Instead it requires early workshops involving several roles within the organisation, scenario planning around growth and often the ability to ask questions the client did not realise they needed to answer. Such as how many employees are actually expected to be present on an average Tuesday, rather than how many desks are formally listed in the organisational chart.

It is rarely productive to force an uncertain client into the same process as a well-prepared one. What works is to identify where the client sits on this scale as early as possible and allow the first weeks of the process to look different depending on the answer.

A practical consequence of the uncertainty is that one should rarely lock in a solution that only works if the guess about the number of employees is correct. Furniture that can be scaled up or down without needing to redraw the entire room, like tables that can be connected or separated depending on how many actually need space on a given day. This means that a misjudgment in the needs analysis becomes an adjustment rather than a redesign.

A good answer to an uncertain needs analysis is rarely a more accurate guess. It is a solution that can handle the guess being wrong.